Featured Turf Talk

From the Corner Office – January 2017 »

Volume 3 / Issue 1 / January 2017 From the Flowtronex team, we wish you a Happy New Year!  Thank you for your business support and making 2016 a successful year. We hope you have had the opportunity to visit our Website to view two new exciting products from our engineering team that our customers

Read more

All Turf Talk

Meet the Flowtronex Team – Steve Joice »

Volume 3 / Issue 1 / January 2017 Steve Joice was raised on the farm in Kansas.  It was on the farm that he began working with trucks and tractors at an early age. In 1977, Steve began his electrical career with IBEW (545), and became a journeyman after completing a four-year apprenticeship. Steve came

Read more

Golf Course Builders Association of America’s South Florida Regional Meeting »

Volume 3 / Issue 1 / January 2017 On December 2, Flowtronex was a sponsor of the Golf Course Builders Association of America’s South Florida Regional Meeting. The one day conference was attended by over 100 industry professionals with two separate educational panel discussions – one for irrigation consultants and the second for golf course

Read more

HydroTurf International installation at Dubai Hills Golf Course in Dubai, UAE »

Volume 3 / Issue 1 / January 2017 HydroTurf International completed installation of a new Flowtronex pump station for the Dubai Hills Golf Course in Dubai, UAE. The pump station provides 5280 GPM @ 132 PSI using 6 x 125 HP Goulds Water Technology vertical turbine pumps. The pump station incorporates aluminum support skids for

Read more

From the Corner Office – October 2016 »

Volume 2 / Issue 2/ October 2016 Flowtronex has enjoyed a very exciting month of August with the introduction of 2 new additions to our product family. Whether it is extending the life of your current pump station, or searching for a new,  cost-effective pump station featuring high quality standards you expect from Flowtronex, your

Read more

Designed for Water Reliability – Oasis g2 Retrofit Panels »

Volume 2 / Issue 2/ October 2016 The new Oasis g2 controller and retrofit panels have been introduced as the latest design in the effort to extend the life of pumping stations by upgrading the controls of a panel while reusing the power components. The retrofit panels come with the ability to control fixed speed

Read more

Tech Service Shop – PACE helpful tip »

Volume 2 / Issue 2 / October 2016 In the PACE Control Platform for Flowtronex Pump Stations, there is a feature called Dp/Dt found in the Tuning Menu, (PACE w/ 12” Screens), or the Field Setup Menu, (PACE w/ 6” Screen). This feature monitors the rate of change of rising or falling pressure over time,

Read more

Meet the Flowtronex Team – Ricardo Gonzales »

Volume 2 / Issue 2 / October 2016 In 2005, Ricardo Gonzales started his career at Flowtronex in the customer service department. He quoted and ordered pumps and pump related parts supporting the Flownet Service Group. In 2009 there was an opportunity for Ricardo to expand his skillset and he secured a position in the

Read more

AGIF seminar – Tan Son Nhat GC in Ho Chi Minh City, Vietnam »

Volume 2 / Issue 2 / October 2016 On July 11 and 12, Flowtronex provided a sponsorship for the AGIF seminar held at Tan Son Nhat GC in Ho Chi Minh City, Vietnam. The two day event featured best practice presentations for golf course superintendents and club managers, along with a field demonstration day for

Read more

Country Club of North Carolina »

Volume 2 / Issue 2 / October 2016 Matthew Gross with Smith Turf & Irrigation gives adulates to Flowtronex Engineer for product support.  Flowtronex PACE controls are now intergraded with Toro Lynx via cellphone modem. “I just wanted to say thanks’, we were able to get Country Club of North Carolina pump integrated today with

Read more